MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users., This news data comes from:http://fqumkf.yamato-syokunin.com
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.

ERC amends net-metering rules to expand renewable energy options
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.
In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
ERC amends net-metering rules to expand renewable energy options
- Palace to Discayas: Prove allegations
- Israel military says controls 40 percent of Gaza City
- Comelec probes 15 contractors for illegal campaign donations
- Japanese climber, 102, sets Mount Fuji record
- Protesters storm Discaya office in Pasig to demand accountability for 'ghost flood control projects'
- Ex-DPWH secretary's daughter linked to construction firm in flood control probe, says Lacson
- Immigration: 1st lookout bulletin in effect on 35 individuals, including Discayas, linked to anomalous flood control projects
- AFP: It would take more than a tugboat to tow BRP Sierra Madre from Ayungin Shoal
- Pope demands end to 'collective punishment' and forced displacement of Palestinians in Gaza
- Putin and Modi in China for summit hosted by Xi